Critical Path

Murder City: Season 1: Episode 1

VOTE NOW
0 1 2 3 4 5 6 7 8 9 10
 
Critical Path

Episode Details & Credits

ITV1 | Air Date: March 18, 2004
Summary: When a 16-year-old girl disappears from her home, leaving a blood-spattered bedroom behind, Susan and Luke start trying to track down the missing teenager, hoping that she may still be alive. Meanwhile, the mysterious death of a City trader who is shot in the neck with an arrow proves a tough case to crack.
Genre(s): Drama

Season 1 Episodes

Seasons & Episodes